AnantState
Industry · Manufacturing

Correct the line while it is still on spec.

A production line rarely fails all at once. A parameter drifts, yield slips, and scrap appears shifts later. AnantState tracks each line and machine against how it should be running, so the drift is visible while a correction is cheap.

In plain termsSpot a drifting line before it makes scrap.

The shifts before the scrap

An illustration of one line, from a normal run to out of spec.

The entities are the lines, machines, batches, work orders and supplier lots a plant is run through. Each has a condition that moves with the product mix and the schedule, and occasionally with something nobody planned.

A line drifting before it scraps · illustrative

  1. Shift 1: Normal runOutput sits on its expected path
  2. Shift 4: A parameter starts to driftYield is still inside spec
  3. Shift 6: Cheapest point to correctAdjust now, before any scrap
  4. Shift 9: Out of specScrap and rework begin
  5. Phase: Cheap to correctfrom A parameter starts to drift to Cheapest point to correct
  6. Events are shown in order, not to scale.
A process parameter that starts to drift is visible while output is still inside spec, and that is the cheapest point to correct it.

Why it costs more than it should

  • Quality is checked at the end. A line can run for shifts on a drifting parameter before an inspection finds it.
  • Maintenance follows the calendar. Intervals are fixed because nobody has priced the alternative of acting on condition.
  • Causes are argued afterwards. A scrap event is explained in a meeting, with no way to replay the decision that led to it.

What moves on a line

StateBaseline driversUnexpected drivers
Line conditionRuntime, product mix, maintenance intervalWear, contamination, operator variance
Yield and qualityRecipe, feedstock lot, throughputProcess drift, supplier lot variation
Schedule adherenceThe plan, changeoversBreakdowns, missing material
Unplanned-stop riskAge, intervalCascading failure

A worked example

Thirty lines, and early correction on the ones drifting fastest.

Round, illustrative figures for production lines: they show the arithmetic, leave out the subscription, and are for you to change in the calculator.

InputValueWhat it stands for
Production lines in scope30Everything the team is responsible for
Value at stake per one$45,000Scrap, rework and lost output on one line over the horizon
Cost of the action per one$1,800Correcting a drifting process parameter or inspecting the line
Share acted on30%The lines drifting fastest: 9 of 30
Modeled, USDPessimisticExpectedOptimistic
Share of value at stake avoided8%20%35%
Cost to act, in total$16,200$16,200$16,200
Avoided loss$32,400$81,000$141,750
Net position$16,200$64,800$125,550

Break-even is 4.0%: each action costs $1,800 against $45,000 at stake, so it has to avoid that share of the loss to pay for itself.

What exists today

Manufacturing exists as catalog templates (design to produce, equipment maintenance and others). The industrial and IoT domain compiled into the engine is the closest starting point. It is not a live simulated plant.

Bring a line that scraps

Give us a month of line events and what a correction costs. We will show where the drift was visible before the scrap.